Skip to content

Service

Building Wiring

Conduit and surface wiring for new builds, extensions and rewires.

Eurovic electricians routing conduit pipes across a reinforced concrete slab at Amen Estate Phase 3

Good wiring starts long before the walls are plastered. We work from your electrical drawings to lay conduit at slab stage, chase and route it through blockwork, then pull, terminate and label every circuit.

Where concealed conduit isn't practical, for example in finished buildings, extensions or industrial spaces, we install neat surface conduit and trunking that is straight, secured and easy to maintain.

Ideal for

  • New residential and estate developments
  • Commercial buildings
  • Rewiring older properties
  • Extensions and renovations

What’s included

  • Reading and working from electrical drawings
  • Slab-stage conduit layout and ceiling drops
  • Wall chasing and conduit rough-in
  • Surface conduit and trunking installation
  • Cable pulling, termination and circuit labelling
  • Lighting points, sockets and switches
  • Distribution board installation and dressing
  • Testing before handover

On the job

From our recent work.

Conduit rough-in chased into blockwork walls before plastering
Electrician fixing surface conduit runs along a ceiling
Electricians installing conduit on slab formwork under a clear sky
Electrical layout drawing for a duplex at Amen Estate Phase 3
Neatly wired distribution board with red and black conductors dressed in place

Related projects

FAQ

Building Wiring: common questions

  • Conduit (concealed) wiring runs inside pipes buried in the slab and walls, so it is hidden once the building is plastered. Surface wiring runs in conduit or trunking fixed on the wall or ceiling, which suits finished buildings, extensions and spaces where access for maintenance matters.

  • Before the slab is cast. Conduit for ceiling points has to go in at slab stage, and wall conduit goes in before plastering. Bringing us in early avoids breaking finished work later.

  • Yes. For occupied buildings we usually recommend surface conduit or trunking, planned room by room to keep disruption low.

Other services

Let’s talk

Need building wiring?

Tell us what you need. We'll respond with clear next steps and a quote.

Open Monday – Saturday, 6:00am – 7:00pm